EPG has been productively licensed by ISO9002 Top quality Management Method, ISO9001 Quality Administration Technique, API certificate, ISO/TS16949:2002 and ISO10012 measurement management system. PersonnelOur sales folks are properly qualified to accommodate your requests and converse English for your comfort. With several years’ experience in these strains, we have been distinguished from other suppliers in China by our benefits in aggressive pricing, on-time shipping and delivery, prompt responses, on-hand engineering support and very good following-sales solutions.
R sequence Helical Geared EPT Traits
one. Attributes:
1. High efficiency: 92%-97%
2. Compact framework: Tiny offset output, two stage and 3 stage are in the identical box.
3. High precision: the EPT is created of large-high quality alloy metal forging, carbonitriding and hardening therapy, grinding process to make certain large precision and steady operating.
four. High interchangeability: extremely modular, serial design and style, sturdy versaEPTty and interchangeability.
2. EPT parameters
Ratio | three.41-289.74 |
Enter EPT | .twelve-160KW |
Output torque | 61-23200N.m |
Output velocity | 5-415rpm |
Mounting kind | Foot mounted, flange mounted, foot and flange mounted, single-phase foot mounted, solitary phase flange mounted, Flange-mounted with extended bearing hub |
Enter Method | Flange input(AM), shaft input(Advert), inline AC motor input, or AQA servo motor |
Brake Release | HF-manual launch(lock in the brake launch situation), HR-handbook launch(autom-atic braking situation) |
Thermistor | TF(Thermistor security PTC thermisto) TH(Thermistor protection Bimetal swotch) |
Mounting Position | M1, M2, M3, M4, M5, M6 |
Kind | R17-R167 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm |
EPT content | EPT200 large-energy forged iron from R37,47,fifty seven,67,seventy seven,87 |
EPT content | EPT250 Higher toughness cast iron from R97 107,137,147,157,167,187 |
Warmth remedy EPT | carbonitriding and hardening treatment method |
Efficiency | ninety two%-97% |
Lubricant | VG220 |
Defense Course | IP55, F course |
EPT Push
ZheJiang EPT Drive Co.,Ltd,the predecessor was a point out-owned army mould EPTrprise, was estabEPTd in 1965. EPT EPTizes in the total EPT EPT answer for substantial-stop products producing EPT based on the purpose of quotPlatform Merchandise, Software Layout and Professional Service quot.
EPT have a robust technical pressure with over 350 staff at present, incXiHu (West Lake) Dis.Hu (West Lake) Dis. over thirty engineering experts, 30 good quality inspectors, covering an location of 80000 sq. meters and kinds of EPT processing EPTs and tests equipments. We have a very good basis for the industry application deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment and services of high-stop speed EPTs amp variators owning to the provincial engineering EPT study cEPTr,the lab of EPT pace EPTs, and the base of present day R ampD.
Our Team
EPT Manage
EPT:Insist on EPTrovement,Attempt for Excellence With the deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment of products producing indurstry,customer in no way satirsfy with the current top quality of our merchandise,on the contrary,wEPT the benefit of good quality.
EPT plan:to boost the general degree in the area of EPT EPT
EPT See:Constant EPTrovement , pursuit of excellence
EPT Philosophy:EPT EPTs worth
three. Incoming EPT Handle
To establish the AQL appropriate level of incoming materials handle, to give the materials for the EPT inspection, sampling, immunity. On the acceptance of experienced merchandise to warehousing, substXiHu (West Lake) Dis.Hu (West Lake) Dis.rd goods to just take return, check out, rework, rework inspection dependable for tracking negative, to check the supplier to consider corrective
steps to avoid recurrence.
4. Procedure EPT Control
The manufacturing internet site of the 1st evaluation, inspection and closing inspection, sampling according to the requirements of some projects, judging the high quality alter trend
identified irregular phenomenon of production, and supervise the manufacturing section to enhance, remove the abnormal phenomenon or state.
five. FQC(Closing QC)
Right after the production section will complete the product, stand in the customer’s place on the completed product high quality verification, in order to make certain the high quality of
client anticipations and wants.
six. OQC(Outgoing QC)
After the merchandise sample inspection to deterEPT the competent, allowing storage, but when the completed solution from the warehouse just before the formal delivery of the products, there is a verify, this is referred to as the cargo inspection.Check out content material:In the warehouse storage and transfer position to confirm, even though confirming the supply of the
merchandise is a item inspection to deterEPT the competent merchandise.
7. Certification.
EPT
Delivery